SAP PP stands for Production planning control. Here are some useful and important SAP PP transaction codes which are commonly used in this module.
Work Center transaction codes
- CEWB: Engineering Workbench
- CC04: Display product structure
- CR01, CR02, and CR03: Create, change and display work center respectively.
- CA85 Replace work center
- CR11, CR12, and CR13: Create, Change and Display capacity respectively.
- CR21, CR22, and CR23: Create, Change and Display hierarchy respectively.
- CR60: This transaction code is used for Work center information system
- CR05: Work center list
- CR06: Cost center assignments
- CR07: Work center capacities
- CR08: Work center hierarchy
- CA80: Work center usage
- CR15: Capacity usage
- CR10: Work center change document
- CR03: Display work center
- CR13: Display capacity
- CR23: Display hierarchy
BOM
- CS01, CS02, and CS03: Create, Change and Display BOM.
- CS11: Explode BOM level by level – single and multi level
- CS12: Explode multi-level BOM
- CS13: Display summarized BOM
- CS03: Display single-level BOM
Routing transaction codes
- CA01, CA02, and CA03: Create, Change and Display routing respectively
- CA11, CA12, and CA13: Create, Change and Display reference operation set respectively.
- CA12, CA22, and CA23: Create, Change and Display rate routing respectively.
- CA31, CA32, and CA33: Create, change and Display reference rate routing respectively.
- CA85: Replace work center
- CA95: Replace reference operation set/reference rate routing
- CA75: This transaction code is used for Replace PRT
- CA97: Schedule material masters
- CA96: Update material masters
- CA99: With archiving
- CA98: Without archiving
- CA70: PRT use
- CA90: Reference operation set usage
- CA80: Work center usage
- CA51: Print list
- CA60: Routing changes
- CA63: Rate routing display documents
- CA64: Reference rate routing change documents
Capacity
- CM21: Capacity leveling work center view – Capacity planning table
- CM22: Capacity leveling work center view – Capacity planning table (tabular form)
- CM27: Capacity leveling individual capacity view – Capacity planning table
- CM28: Capacity leveling individual capacity view – Capacity planning table (tabular form)
- CM31: Capacity leveling order view – Capacity planning table
- CM23: Capacity leveling order view – Capacity planning table (tabular form)
- CM25: Variable capacity leveling: Online
- CM40: Variable capacity leveling: Execute in the background
- CM41: Variable capacity leveling: Background log
- CM32: Capacity leveling project view – Capacity planning table
- CM26 Capacity leveling project view – Capacity planning table (tabular form)
- CN22, CN23: Capacity requirements – Change, display network respectively
- MD12, MD13: Capacity requirements – Change, display planned order respectively
- CM01: This transaction code is used for Capacity evaluation work center view: Load
- CM02: Capacity evaluation work center view: Orders
- CM03: Capacity evaluation work center view: Pool
- CM04: Capacity evaluation work center view: Backlog
- CM05: Capacity evaluation work center view: Overload
- CM07: Variable capacity evaluation
- CM50: Extended evaluation: Work center view
- CM51: Extended evaluation: Individual capacity view
- CM52: This transaction code is used for extended evaluation: Order view
- CM53: Extended evaluation: Project view: WBS element/operation
- CM54: Extended evaluation: Project view: Version
- CM55: Extended evaluation: Work center/Version
Planning tcodes
- MD25, MD26, and MD27: Create, Change and display planning calendar respectively.
- MDL1, MDL2, and MDL3: Create, Change and Display production lot respectively.
- MD01: Total planning online
- MDBT: Total planning in background
- MD03: This transaction code is used for Single-item, single-level planning
- MD02: Single-item, multi-level planning
- MD43: Interactive single-item planning
- MD50: Multi-level, make-to-order planning
- MD51: Multi-level project planning
- MD20, MD21: Create and Display planning file entry respectively.
- MD11 and MD12: Create and change planned order respectively.
- MD13 and MD16: Individual and collective access of planned order respectively
- MDLD: print MRP list.
- MD61, MD62, and MD63: Create, Change and display planned independent requirements respectively
- MS31, MS32, and MS33: Create, Change and Display planning scenario respectively.
- MF50, MF52: Change and Display planning table respectively.
- CO01, CO02, and CO03: Create, Change, and display production control order respectively.
Also Read : PP Tables -> SAP BOM