SAP WCA2 (WCM: Work and Requirements) Table & Fields

WCA2 is a SAP table coming under PM module and EA-APPL component.View details, Fields & related tables of WCA2.
  • Table description : WCM: Work and Requirements
  • Module : PM-WCM
  • Parent Module : PM
  • Package : WCM
  • Software Component : EA-APPL

WCA2 hierarchy

EA-APPLPMPM-WCMWCA2

WCA2 Fields structure

FieldNoteData ElementDomain
MANDTClientMANDTMANDT
OBJNRObject numberJ_OBJNRJ_OBJNR
.INCLUDEWCM: Work    
WK01Hot Work AWCEWK01WCDWK
WK02Hot Work B in Classified AreasWCEWK02WCDWK
WK03Entry to Confined SpacesWCEWK03WCDWK
WK04Isolation and Testing or Bypassing of Safety SystemsWCEWK04WCDWK
WK05Work on Hydrocarbon Systems (CmHn)WCEWK05WCDWK
WK06Pressure TestingWCEWK06WCDWK
WK07Work over Open SeaWCEWK07WCDWK
WK08Work with Hazardous SubstancesWCEWK08WCDWK
WK09Work with Radioactive MaterialsWCEWK09WCDWK
WK10Well Operation/Well InterventionWCEWK10WCDWK
WK11Work with ExplosivesWCEWK11WCDWK
WK12Critical Lifting OperationsWCEWK12WCDWK
WK13Other Activities/Critical OperationsWCEWK13WCDWK
WK14NightworkWCEWK14WCDWK
WK15Work at HeightWCEWK15WCDWK
WK16Overhead WorkWCEWK16WCDWK
WK17Replacing LampsWCEWK17WCDWK
WK18Work in ManholesWCEWK18WCDWK
WK19Cleaning WorkWCEWK19WCDWK
WK20Demolition WorkWCEWK20WCDWK
WK21Work on VentilationWCEWK21WCDWK
WK22Work on Water SupplyWCEWK22WCDWK
WK23Work on Gas PlantWCEWK23WCDWK
WK24Simultaneous WorksWCEWK24WCDWK
WK25Restructuring WorkWCEWK25WCDWK
WK26Painting WorkWCEWK26WCDWK
WK27CheckingWCEWK27WCDWK
WK28More WorkWCEWK28WCDWK
.INCLUDEWCM: Requirements    
NEED01DepressurizationWCENEED01WCDNEED
NEED02Draining/EmptyingWCENEED02WCDNEED
NEED03Cleaning/Hydrocarbon FreeingWCENEED03WCDNEED
NEED04Venting/Installation of Extra VentilationWCENEED04WCDNEED
NEED05Prevent Release of Oil and Gas in the Work AreaWCENEED05WCDNEED
NEED06Measures Against Radioactive RadiationWCENEED06WCDNEED
NEED07Regular Inspection of the Work AreaWCENEED07WCDNEED
NEED08Gas Measurements Prior to/During Working PeriodWCENEED08WCDNEED
NEED09Fire PreventionWCENEED09WCDNEED
NEED10Continuous Guard/RadioWCENEED10WCDNEED
NEED11Drains Blocked/CoveredWCENEED11WCDNEED
NEED12Set Up Barriers and Safety SignsWCENEED12WCDNEED
NEED13PA AnnouncementsWCENEED13WCDNEED
NEED14Welding Machine Safely Located and EarthedWCENEED14WCDNEED
NEED15Follow Requirements for Work on Open SeaWCENEED15WCDNEED
NEED16Follow Requirements for Work At HeightWCENEED16WCDNEED
NEED17HSE Datasheet Known and AvailableWCENEED17WCDNEED
NEED18Job Safety Analysis (JSA)WCENEED18WCDNEED
NEED19Lockout/TagoutWCENEED19WCDNEED
NEED20Provide Extinguishing MediaWCENEED20WCDNEED
NEED21Set Up Fire WatchWCENEED21WCDNEED
NEED22Inform External BodiesWCENEED22WCDNEED
NEED23On-Site InstructionWCENEED23WCDNEED
NEED24Additional Protective EquipmentWCENEED24WCDNEED
NEED25Maintain Initial ListWCENEED25WCDNEED
NEED26Safety StaffWCENEED26WCDNEED
NEED27More MeasuresWCENEED27WCDNEED
NEED28Secure InstallationsWCENEED28WCDNEED
.INCLUDEWCM: I/O Administration Data (Create)    
CRNAMECreated byWCECRNAMEUSNAM
CRDATEDate on Which the Object Was CreatedWCECRDATEDATUM
CRTIMETime at Which Object was CreatedWCECRTIMEUZEIT
.INCLUDE